So far it has been really easy, because 1) this is our second bathroom remodel (and we've remodelled our kitchen twice) so we know what we are doing, 2) it is a small bathroom, 3) it has a basement below it, so running the pipes through is really easy. The shower will be the worst part of the job, so we are leaving it for last. Plus we need that second toilet soon. Could he come over? Only after he is finished with my kitchen and front hall floors. :-D
1 comment:
So far it has been really easy, because 1) this is our second bathroom remodel (and we've remodelled our kitchen twice) so we know what we are doing, 2) it is a small bathroom, 3) it has a basement below it, so running the pipes through is really easy. The shower will be the worst part of the job, so we are leaving it for last. Plus we need that second toilet soon. Could he come over? Only after he is finished with my kitchen and front hall floors. :-D
Post a Comment